The scope of work consists of furnishing all materials, labor, equipment, and supervision necessary to abandon and remove the 10th Street Reservoir, and existing 1925-era 0.5-million-gallon riveted steel water storage tank. The work also includes the removal of the foundation, associated site piping and appurtenances, and replacement of the existing 700 gpm pump station. Water Systems upgrades include, but are not limited to, the following: demolition of the existing 0.5 million gallon reservoir and the existing 700gpm pump station and equipment; abandonment of a section of existing water distribution system;construction of approximately 2,400 feet of new water distribution pipelines with all relevant fitting,valves, and manholes; a new distribution pump station which includes new electrical, new pumping equipment, and all other relevant equipment; construction site improvements that include, fencing,masonry pavers, and landscaping of site