Specifications include, but are not limited to: Realigning a straightened reach of Fanno Creek in Beaverton, Oregon replacing a culvert with a new bridge, and replacing portions of a recreational trail. The work consists of providing labor, materials, and equipment to remove an existing path, culvert, vegetation and debris; constructing a stream channel, path and footbridge; enhancing the stream channel and floodplain, and protecting infrastructure with encapsulated soil lifts, logs and rock; and grading and finishing the Project site to the lines, grades and cross-sections indicated in the Contract and approved by the District Representative using haul material, fill and topsoil material salvaged from the site.