Specifications include, but are not limited to: The Work under this contract includes upgrades to the existing Boone Road Water Pump Station, constructing a new electrical and control building, furnishing and installing an on-site emergency generator station, yard piping improvements, buried utility vaults, cathodic protection system upgrades, paving, grading, and associated site work. Pump station site work also consists of half street improvements, landscaping, and site drainage improvements including stormwater treatment and detention facilities. The new electrical and control building work includes electrical, HVAC, and pump station instrumentation and control. The existing pump station upgrade work includes replacing two existing 200 hp pumps and one 400 hp pump with three new 400 hp pumps, including discharge piping improvements, replacing three existing pump cans, and structural upgrades to the pump station building. Yard piping work includes waterline connections to existing buried suction and discharge pipe mains, new surge tank, furnishing and installing two valve vaults, and stormwater collection piping for rain garden facility.