Specifications include, but are not limited to: This project will create a new fiber optic network connection between existing PBOT and ODOT facilities. A new 48F cable and new 14/16 gauge IMSA 9-strand conductor cable will be placed in existing PBOT / Tri-Met signal conduit to an existing Tri-Met Shelter; a new aerial pathway will be constructed; a new 2” underground conduit will be placed for 3 feet where a new utility vault will be placed. From this new vault location, the new conduit pathway will continue for approximately 52 feet to an existing ODOT cabinet location. Place a new 24” x 36” x 36” utility vault and terminate riser in new vault. Pull new 288F cable through new riser and into vault. Leave 100’ slack storage for spicing and termination. Place a new 2” conduit heading north for 52’ to an existing ODOT cabinet. Leave 100’ slack storage in new 48F cable in new vault for spicing and termination. Pull new 48F cable and # 12 AWG locate wire thru new 2” conduit to an existing ODOT cabinet mounted on the south side of Interstate 84. Leave 20’ slack storage in new 48F cable in ODOT cabinet. Place new 48F cable in one (1) cell of the existing three (3) cell Maxcell conduit sleeve heading north across Interstate 84 to an existing ODOT cabinet on the north side of Interstate 84. Leave 30’ slack in new 48F cable for termination.