Specifications include, but are not limited to: Project is a rehabilitation of the existing piping, pipe supports, installation of hatches in the lift station pump pit concrete deck, and miscellaneous cleaning and coating of existing appurtenances at Broken Arrow’s Greens Lift Station. Specifically, the Work includes saw cutting of the existing concrete deck over the pump vault and installation of three aluminum access hatches, power washing of the interior of the pump vault, removal and reinstallation of valves and spool pieces, surface preparation and new coating application on all exposed piping and appurtenances in the pump vault, and an additive alternate task of cleaning the existing wet well of the lift station as shown in the contract documents.