Specifications include, but are not limited to: 1.) Fabrication and Erection of structural and miscellaneous steel is to be bid as a complete package. 2.) Contractor to make site visit in order to understand site conditions as it relates to site constraints for steel deliveries, crane and other equipment delivery and movements around site. 3.) Include all required hoisting and cranes necessary for the erection of the structural and miscellaneous steel in this bid package. 4.) Contractor shall furnish and install engineering calculations, shop drawings, manufacturer’s data and samples, certifications for connections of structural steel members, welding certificates, and contract closing documents in accordance with the contract documents. 5.) Contractor shall utilize Sideplate Systems to perform all required bolted moment frame engineering. 6.) Contractor shall furnish and deliver to the jobsite FOB (for installation by other trades) specifically but not limited to the following: a. Column anchor bolts. b. Embed/Bearing plates. c. Steel embed plates. (Note: Cast-in-Place concrete embeds shall have two holes large enough to receive a 16-penny nail in opposite corners for form setting purposes.)