Specifications include, but are not limited to: N. Pine, from Noble to Bridge, (approx. 1201 ft. x 26 ft. wide) City crew will install Signal Loops & prep. Contractor will be responsible for 2” milling and clean-up (3946 sqyds City will have truck on site to recover millings), tack coat,and 3” overlayTerritorial Trails, from Pine to Parking Lot, (approx. 578 ft x 20 ft wide) Citycrew will prep. Contractor will be responsible for final blade prep, Compaction,Tack coat, 5” overlay two lifts.E. Rutgers, Birch to Sycamore, City crew will prep. Contractor will be responsible for tack coat, 1” level coarse and 2” overlay, (approx. 372 ft. x 18 ft.wide)1st, from Noble to Cleveland, Contractor will be responsible for 400 ft of curb &gutter removal and replacement, approximately 2-inch-thick milling and clean-up(966.66 sqyds City will have trucks on site to recover millings) tack coat, and 2”overlay. (approx. 290 ft. X 30 ft. wide).