Specifications include, but are not limited to: A. Floor Contractor/Installer Qualifications and Certifications 1. The flooring contractor shall be a Robbins Accredited Installation with MFMA Accredited Installer(s) on-site for the duration of the wood floor installation; or, a contractor approved by Robbins Sports Surfaces. 2. Flooring contractor shall submit a list of at least three completed projects of similar magnitude and complexity completed under current corporate identity. B. Floor System Design 1. System design provides heavy load blocking throughout floor area. 2. The resilient padding provides consistent gradient resiliency. Assures uniform compression deflection transition from light loading to aggressive loading. C. Floor System Performance 1. Eclipse meets or exceeds criteria of the following performance criteria: a. MFMA PUR b. DIN 18032 Part2 2001 c. DIN 18032 Part2 1991 d. ASTM F2772 Sport Floor Standards e. FIBA International Standards f. EN 14904 Standards.