Specifications include, but are not limited to: The project consists of widening an existing 2-lane asphalt roadway for approximately 1 mile with the first half mile widened from 2-lanes to 3-lanes while the remainder of project will be widened from 2-lanes to 5-lanes. The entire project will include an enclosed storm drainage system as well as concrete curb and gutter. Sidewalk is included and will be added to the north side for the full length of the project while on the south side sidewalk will be constructed from the school east to Aspen. Additional items of work included in the improvements project are extension of existing RCB bridge structure, waterline relocation, and pedestrian hybrid beacon installation.