Specifications include, but are not limited to: 1.2.1 Class B biosolids generated from the Southside and Haikey Creek Dewatering Facility are land applied in accordance with the provisions of the Southside Biosolids Management Permit and Haikey Creek Biosolids Management Permit. The Seller(s) will be required to follow Oklahoma Department of Environmental Quality (ODEQ) approved guidelines, including existing plans and site-specifics provided as part of this Agreement. 1.2.2 The Seller(s) will be paid on a per cubic yard basis and must provide sufficient equipment to load, transport and unload all dewatered and liquid biosolids stored in storage beds. An estimated volume of 30,000 cubic yards will be removed from the Southside storage beds each year and 3,000 cubic yards will be removed from the Haikey Creek storage area each year. This quantity is an estimate to be used for bidding purposes only. The City and the Seller(s) must arrive at a mutually agreeable volume for the purpose of payment prior to commencement of work at either of the biosolids storage locations. Spill Prevention 1. Insure truck drivers watch trailer while loading and unloading. 2. Insure tailgate is closed and latched while transporting. 3. Inspect tailgate latches daily and replace as necessary. 4. Inspect tank valves daily and replace as necessary. 5. Insure tarps are in place while transporting. 6. Insure unloading operations in the field are conducted so as to minimize tracking biosolids back onto public roadways. 7. Establish and maintain good sanitation practices at loading and off-loading zones so as to avoid tracking of biosolids material onto roadways. 8. Insure dust covers are in place when hauling material in open dump trucks.