Specifications include, but are not limited to: All required site work, site clearing, excavation, trenching, backfilling, grading, new paving, curbs, topsoil, seeding, building foundation and preparation work. Repair of existing pavement after completion of construction. 9. All Exterior concrete work such as duct banks, equipment pads, building foundations, pole foundations, and floors, etc. Furnish and install a new prefabricated 1.5 MW Traction Power Substation. 13. The new prefabricated substation shall be equipped with a security system. 14. The new prefabricated substation shall be equipped with a four (4) PTZ camera system. 15. The new prefabricated substation shall be equipped with a 125 VDC Battery System, associated equipment, charger, rack, and containment. 16. The new prefabricated substation shall be equipped with a new telephone system, including outlets and necessary appurtenances. 17. Furnish and install FTA Project sign. 18. All ISO & Tie switches shall be equipped with contacts and terminal blocks for SCADA communication. 19. The new prefabricated substation shall be equipped with a PVI Rectifier Transformer. In order to accommodate future rail cars the rectifier transformer shall be equipped with an additional tap for 750 VDC. The tap shall be constructed such that when in use, the rectifier output voltage shall be 750 VDC under 100% load.