Specifications include, but are not limited to: • Demolition/removal of existing equipment including, but not limited to, portions of belt conveyor, belt filter press, belt filter press feed pumps, piping and valves in belt filter press room, submersible WAS pumps (to be replaced with new) and primary sludge pumps (to be replaced with new). • Demolition of structures as indicated on the Drawings, including, but not limited to, microwave dryer electrical room, area where new doorway is to be installed and all demolition of floor/walls required for installation of new items. • Installation and startup of Owner-furnished equipment, including new screw press, reaction tank, screw conveyor control panel, and associated items. • Provision/installation of all other equipment, piping and valves as shown on Drawings and as specified. • Electrical and I & C work • Construction of new screw press room • Provision/installation of new door and concrete slab on north side of existing building • Provision/installation of two (2) new submersible sludge pumps and two (2) new primary sludge pumps and associated VFDs • Modifications to Primary Clarifier Scum removal • All other related work as shown and specified.