Specifications include, but are not limited to: • Obtain applicable permits for the job • Perform all work within OSHA rules and regulations • TEAR-OFF flat roof application where the existing Modified Bitumen roofing material is completely removed. This is followed by a complete and thorough inspection of the decking to insure that there is nothing damaged or rotted • Remove and Replace Entire Steel Deck • Provide and haul away all commercial dumpsters necessary for all waste removal • Deliver materials via roof-top delivery by crane • Prepare surface area for roof replacement; sweep dirt, gravel and all damaged material • Mechanically fasten 2 staggered layers totaling 3” (R-Value = 17.4) of Versico or similar poly-ISO) insulation board to steel deck using 12 fasteners & plates per 4’ x 8’ sheet • Fully adhere Versico or similar 60 mil EPDM non-reinforced membrane (color: black) to poly-ISO insulation board • Overlap all field seams a minimum of 6” to create a single monolithic roofing substrate • Install Versico or similar pre-manufactured soil stack boots and all other applicable flashings • Flash all penetrations, soil stacks, and all other applicable flashings • Seal all flashings with Versico or similar adhesives and sealants • Install termination bar up existing parapet walls as needed • Clean up and remove all debris • 20-Year Warranty