Specifications include, but are not limited to: Pump test per NFPA (National Fire Protection Association) with complete operation, documentation and tags annually Wet system test inspection per NFPA 25 with complete visual walk-through, documentation and tags annually Standpipe test per NFPA 25, complete valve flow and operation, documentation and tags annually The annual inspection tag(s) must contain the name of the individual performing the work and the state fire marshal installer certification number(s) when applicable, date of test, result of inspection and test, and deficiencies or impairments noted. Dry system inspection with complete trip and drain, second drain within 4 weeks. Complete visual walk-through, documentation and tags annually with a hydrostatic test every five years or as directed by NFPA 25.