Specifications include, but are not limited to: This Design Build project will consist of the final design and construction of a new complete street corridor along South Main Street between the general limits of Mill Street and State Route 59. Full roadway improvements are proposed including pavement, drainage structures, water main, steam, fiber optics, other private utilities curb, sidewalk, decorative and/or landscape buffers, parallel parking with permeable pavers, LED smart lighting and cycle track. Vehicle lanes will be aligned consistently with turn lanes at the primary intersections. Bump outs are proposed to better define parking areas and provide better pedestrian crossings. New traffic signals are proposed including interconnect and video detection and mid block crossings for pedestrians with appropriate signage.