Specifications include, but are not limited to: Relamping of radio communications towers. Bidder shall be responsible for providing all bulbs. The bulbs provided shall have the longest life of commercially available bulbs. Bidder shall respond to outages where both bulbs of a beacon are out within two (2) business days (48-hours) unless prohibited by weather conditions. Bidder shall spot relamp a bulb that fails within the first three (3) months of installation. Bidder shall bid a total cost per site to bulb the entire tower in total, no individual bulbing will be accepted (excepting the warranty spot bulb). This amount should include but not be limited to: cost of supplies (bulbs, etc.), travel costs, and labor charges.