Specifications include, but are not limited to: 1. Barricade the office area as necessary to safely perform the work. 2. Procurement of a single-zone ductless HVAC system consisting of a cassette and condensing unit. The unit shall be capable of providing both cooling and heat to the office space. The unit shall include all required accessories including, but not limited to, refrigeration kit, condenser wall bracket, and thermostat. 3. Confirm that electricity that is required for both the indoor and outdoor units of the HVAC system is available and that lockout/tagout for the circuit breakers that will be installed has been performed. 4. Provide adequate dust control during all demolition activities. 5. Protect existing furniture, computers, etc. from damage or exposure to dust and debris performance of the work 6. Install the new HVAC mini-split system. 7. Connect the electrical lines to both the indoor and outside units 8. Install the refrigerant line and pressure test. 9. Perform start-up activities and provide training for facility personnel. 10. The Contractor is responsible for obtaining all necessary inspections, permits, and license fees required to perform the work.