Specifications include, but are not limited to: A. Project Description 1. Project Scope: a. Build one (1) New Elementary/Middle School to house grades PK-8 for 1,149 students; 128,292 sf; $33.46M co-funded project. Location: New PK-8 building to be built on the Existing High School Campus. b. Abatement & Demolition of the Existing K-8 building. Co-funded budget is approximately $1.10M. c. Renovation/Reprogramming of the Existing High School Building. Co-funded budget is approximately $5.80M. 2. The District plans to include locally funded initiative (LFI) budget for the following: a. New PK-8 Building – material upgrades and additional improvements - $2.55M. b. Existing High School Building – 21st Century space reprogramming and site improvements - $0.16M. c. Board Office and Vocational Space renovations (located within the Existing High School Building). Locally funded budget is approximately $0.13M. d. Auditorium (800 seats) - $3.5M. 3. Projects are to be built in accordance with the Ohio School Design Manual. 4. The students from the Existing K-8 Elementary/Middle School will remain in their existing facility until the New PK-8 is completed. 5. The students from the Existing High School Building will remain in their existing facility during the renovation/reprogramming, utilizing swing space as needed. 6. The district is pursuing a Student Centered Learning Environment and desires an Education Visioning process. 7. The district has their local funding in place. The Project Agreement between the District and OFCC is anticipated by January 2020 and therefore it is the intent of the OFCC to have the AE Agreement shortly thereafter. 8. The New PK-8 Elementary/Middle School Building has a requirement of LEED, Version 4.0. The Existing High School has a LEED waiver in place. 9. This project includes a storm shelter allowances: a. Existing High School – hardening 4,294 sf with a budget of $438,773.24 b. New PK-8 Elementary/Middle School – hardening 6,847 sf with a budget of $493,924.37 10. This project includes Emergency Responders Radio Allowances: a. Existing High School - $99,874 b. New PK-8 Elementary/Middle School - $128,292 11. The district is anticipating the following schedule. a. Phase 1: New PK-8 School Design: Design 03/2020 – 03/2021; Construction 02/2021 – 07/2022; School to open for the 2022-2023 school year. b. Phase 2: Renovation/Reprogramming on the existing High School and Vocational Space as well as the renovation of the existing District Offices (located within the existing High School Building)