Specifications include, but are not limited to: DOT-200015 FACD01 VAN FSMF Salt Building Van Wert Full-Service Maintenance Facility 10238 Van Wert-Decatur Road, Van Wert, Ohio 45891•Demolition of two existing geodesic salt domes and one existing I-beam and timber storage building•Ensure District 1 has access to salt between October to April•New 5,000 tons salt storage building with adjacent equipment storage and brine production area. Reinforced concrete walls and slab with minimum 10’ approach apron. Tension Fabric roof structure. •LED lighting mounted outside the path of travel on top of the concrete wall and pointed in to the salt storage area and overhead in the material storage and brine production area •Water and electric utilities to be extended to new building•Heavy Duty asphalt adjacent to the new structure •Project budget $900,000.00 DOT-200018 FACD07 CLA Harmony OP Salt Building Clark County Harmony Outpost 7875 E. National Road (U.S. 40), South Charleston, Ohio 45368•Demolition of existing three salt storage building, and one existing equipment storage lean to building.•Ensure District 7 has access to salt between October to April•New 3,000 tons salt storage building with adjacent equipment storage area. Reinforced concrete walls and slab with minimum 10’ approach apron. Tension Fabric roof structure.• LED lighting mounted outside the path of travel on top of the concrete wall and pointed in to the salt storage area and overhead in the material storage and brine production area•Water and electric utilities to be extended to new building•Electric utility to extend to new building•Heavy duty asphalt pavement adjacent to the new structure•Project budget $850,000.00