Specifications include, but are not limited to: The Criteria Architect/Engineer (C-A/E) team will investigate the individual roof and façade replacement phases that make up this Package. Due to the varying levels of complexity of the existing systems and their interrelationships, each system may require one or more of the following levels of service: POR (Program of Requirements), partial SD with detailed design summary (graphic and narrative) to be used during the design phase (by DB Team), bid evaluation assistance, pre-construction assistance, construction assistance. The Program of Requirements (POR) will be developed by the Criteria Architect/Engineer team for all identified phases. The successful firm shall work closely with the College and other College- contracted Consultants to review and recommend and or select system types/components, phasing, and budgets, as necessary for the successful completion of the project. Program of requirements to include, but is not limited to the following: 1. Structural Review of all Existing Roof Structural Components a. To include load-bearing capacity b. Provide written report of structural analysis findings 2. Perform Roof Drainage System Calculations a. To include current drainage capacity b. To include potential maximum drainage capacity c. To include review with the College’s Consultant d. Provide written report of drainage analysis findings 3. Roof System Selection a. To include review with the College’s Consultant b. To include review with Facilities Operations c. Shall conform with Tri-C roofing standards. 4. Façade Systems Selection a. To include review with the College’s Consultant b. To include review with Facilities Operations