Specifications include, but are not limited to: In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: approximately 3,137 linear feet (LF) of 72” diameter sewer and 50 LF of 48” diameter sewer via trenchless methods; approximately 1,475 LF of 48” sewer via open-cut methods; three flow control structures; eight precast manholes; one cast-in-place manhole; modification of one regulator structure; site work; utility relocation; and surface restoration. The project is located in the City of Cleveland in the vicinity of Superior Ave., East Blvd., and E. 114th St. Please refer to the Contract Documents for a more detailed description of project scope.