Specifications include, but are not limited to: The Design-Builder shall design, obtain permits for, construct, test, startup/commission, and warrant the new Main Substation at MCWWTP. It is anticipated that the DesignBuilder will submit design documents at various milestones for the Cityâs review. The Design-Builder will provide signed and sealed documents and conformed to construction drawings. Throughout the design and construction, the Design-Builder will transmit submittals (including work plans/schedules, shop drawings, O&M manuals, training materials, etc.) for the Cityâs review. In addition, the Design-Builder will arrange meetings (including kickoff meetings, pre-construction meetings, coordination meetings, progress meetings, permit review meetings, design review meetings, etc.) to allow for discussion of design/construction concepts and issues. The Design-Builder will be required to startup/commission the new Work and provide training. The anticipated deliverables and review process will be further defined in the RFP.