Specifications include, but are not limited to: Project Name: 39th St NW Water Main Replacement (TAG 576A) This project is located along 39th St NW from Grunder Ave NW to Norman Ave NW It will involve replacement of approximately 2,300 LF of 6” waterline along with the installation of valves, hydrants, and reconnection to the existing water system. Construction is planned for 2021. Project Name: Cleveland Ave NW Water Main Replacement (TAG 582) This project is located along Cleveland Ave NW from 30th St. to 50th St. It will involve replacement of existing water main and installation of approximately 10,000 LF of 6”, 8”, and 12” waterline along with the installation of valves, hydrants, and reconnection to the existing water system. Construction is planned for 2021.