Specifications include, but are not limited to: all work necessary to demolish and remove a 120 foot tall, 300,000-gallon welded steel water spheroid, including removal of all associated electrical gear, removal of concrete tank floor as required to dismantle and remove base elbow, riser pipe, expansion joint, and valve, overflow pipe and appurtenances; cut off tank anchor bolts flush with concrete foundation; backfilling inside foundation with compacted granular stone, topped with 6-inch thick concrete slab; removal of chain link fence, gate and posts; trenching to locate and cap existing water main; site grading; disposal of excess materials; seeding; and other incidental work to necessary to complete the BRYAN DRIVE WATER STORAGE TANK REMOVAL.