Loading...
Skip to main content
< Back to results

Automatic Salt Brine Makers & Liquid Production


Location
Ohio
Publication Date
10/08/2019 05:49 AM EDT
Closing Date
10/17/2019 02:00 PM EDT
Issuing Organization
State of Ohio - Department of Transportation
Solicitation Number
Description

Specifications include, but are not limited to: ▪ The brine maker pumps and motors shall be designed for use in a highly corrosive environment. ▪ The brine maker will incorporate a fully automatic salinity control. ▪ The brine maker shall be designed to operate from either 115 volt or 230 volt single phase AC current. ▪ All plumbing must be stainless steel or scheduled #80 pvc piping with heavy duty valves. ▪ The brine maker shall have an easy bottom clean out trap, door or other access device. ▪ Brine maker shall be constructed of material to withstand harsh weather treatment. Shall be of metal material and coated/painted for optimum ware and resist corroding.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids