Specifications include, but are not limited to: 1. Mobilization 2. Flagging 3. Excavation. 4. Boring under the tracks at both Ashby and Farnsleigh locations. Boring under Van Aken Boulevard at Farnsleigh Station. 5. Installation of new pullboxes. 6. Placement of approximately 335 feet of conduit at Farnsleigh Road and 475 feet of conduit at Ashby Road. 7. Providing and Installing new signal cable, as indicated on the drawings. 8. Connections to the rail and to the proper termination locations in the signal control boxes. 9. Backfill, seeding, mulching, watering, and restoration of all disturbed landscaped areas, walks, and pavement. 10. Testing. 11. Protection of the track structure from contamination. 12. Permits and City inspection fees.