Specifications include, but are not limited to: The NDDOT is soliciting proposals for a Public Information Coordinator (PIC) to create a comprehensive PIC plan and manage specific aspects of PIC pertaining to projects for the Fargo District Office. It is the intention of NDDOT to hire one firm to cover multiple projects. Projects may be added or deleted based on funding availability, needs and FHWA funding requirements. The multiple projects include: • Fargo Main Ave, Phase II (Red River to University Drive reconstruction. • Fargo I-29/12th Ave. N. interchange, Fargo Tri level bridge, and I-29 bridges over Sheyenne River near Harwood bridge overlay. • Fargo I-29 concrete pavement repair from 52nd Ave. S. to Main Avenue. • Fargo 19th Ave. N. asphalt overlay from Dakota Drive to I-29. • I-29 Wild Rice River bridge repair. • I-94 WB asphalt overlay from West Fargo to Casselton. • Fargo I-29 bridge approach slab lifting at multiple locations. • Fargo/West Fargo Interstate Storm Closure gate replacements. • Fargo 64th Ave. S. overpass of I-29. • Fargo I-29 concrete median barrier installation 17th Ave. S. to 32nd Ave. S. • F-M Diversion work that affects I-29, I-94 and ND 10 • I-94 over I-29 and 45th Street over I-94 deck overlays • I-94, concrete median barrier and median cable guardrail • I-29 SB 13th Ave. S. off-ramp at 38th St. • I-94 drainage improvement from 25th St. to the Red River • I-29 bridge painting in north Fargo • I-94 Crack and Seat with asphalt overlay from Raymond to Drain 21 • I-29 NB 13th Ave ramp at 36th Street