Specifications include, but are not limited to: Work generally includes replacement of existing submersible pumps at both Lift Station 24 and 32, coating of the existing wet well at both lift stations and coating of one manhole near Lift Station 24, removal of the valve manhole at Lift Station 24 and replacement with a larger cast-in-place valve vault, and force main modifications at Lift Station ; Electrical Construction: Work generally includes removal of existing control panels and installation of new control panels and associated circuitry at Lift Station 24 and 32. Contract No. 3 – Combined General, Mechanical, and Electrical Construction: Construction consisting of the Work described under Contract No. 1 – General Construction and Contract No. 2 – Electrical Construction.