Specifications include, but are not limited to: The selected Respondent to this Request for Proposals (RFP) shall supply the Mechanical Dewatering System Equipment with the specified design capacity, consisting of all required equipment, controls, appurtenances, and manufacturer's services as defined herein for a complete and operational system. The Mechanical Dewatering Equipment Supplier shall be regularly engaged in the design, manufacture, and assembly of Mechanical Dewatering System Equipment of the size and type specified. Acceptable dewatering technologies: Screw Press and Volute Press. The Mechanical Dewatering System Equipment will be installed by a general contractor (GC) as part of the City's Wastewater Dewatering System Improvements project, which is anticipated to bid in March 2020. The configuration and similar aspects of the GC project scope will be tailored to the selected Mechanical Dewatering Equipment Supplier's system. The selected Mechanical Dewatering Equipment proposal will be included in the Contract Documents for the GC project, when it is bid, for reference only.