Specifications include, but are not limited to: The North Dakota Dept. of Transportation (NDDOT) scheduled the reconstruction of Demers Avenue through downtown Grand Forks for the 2019 construction season. Concurrently, the City of Grand Forks developed a Downtown Action Plan, including streetscape concepts. Those concepts were incorporated into the NDDOT project, which is now underway; however, a major component will be only partially completed by NDDOT. A signature element of the streetscape plan is a series of internally lit pillars, each approximately 14’ tall (see attached concepts). Ten of these are to be located along Demers between 5th Street and the Sorlie Bridge, primarily at intersections. The NDDOT project includes installation of ten pre-cast concrete bases/seat walls that contain an electrical circuit to power future light columns. The City of Grand Forks is seeking a qualified artist/architect/artisan/contractor team to design, fabricate and install the light pillars along Demers Avenue in 2020.