Specifications include, but are not limited to: The bidder shall furnish a Tier 3 emergency generator in skin tight enclosure, and shall deliver the equipment to the site and set the equipment in place. The concrete pad and final connections to the equipment shall be by the electrical contractor for a concurrent construction project at the West Dining Center. Two equipment options shall be provided in the bidder’s response: a. Option #1: 450 KW generator. b. Option #2: 600 KW generator with a separate outdoor rated 800A transfer switch. 2. Include information on availability of replacement parts for the engine and alternator and the typical lad time for parts to repair the engine or alternator. 3. Include drawings showing the dimensions of the generator enclosure and transfer switch, including required clearances for access panels, doors, etc. 4. All proposal items shall include all required sales tax, fees, and insurance costs to furnish the items listed above. 5. Include at minimum (1) semi annual inspection and (1) annual inspection in the proposal. 6. Include an anticipated delivery date for the equipment with the proposal. 7. Include startup costs for the generator, the transfer switch, and for an existing ASCO 7000 Series open transition transfer switch that has been furnished under a separate construction project.