Specifications include, but are not limited to: 1. 1 Each Cedar Grove pie area – this includes prepping, priming, and painting the walls and the metal beams located on the ceiling with latex-based paint and primer or similar, two colors to be determined, approximately 1,500 Sq. Ft. (Please reference Attachment A for photos of area) $ $ 2. 1 Each Maplewood pie area – this includes prepping, priming, and painting the walls and the metal beams located on the ceiling with latex-based paint and primer or similar, two colors to be determined, approximately 1,500 Sq. Ft. (Please reference Attachment A for photos of area) $ $ 3. 1 Each Nutrition Services Building – this includes prepping, priming, and painting the food services ramp area consisting of the ceiling, walls, and handrails, approximately 4,391 Sq. Ft. (Please reference Attachment A for photos of area) $ $ 4. 1 Each Collette Gymnasium walls (no ceiling) – this includes prepping, priming, and painting (two colors – photo attached for reference) with latex based paint and primer or similar, approximately 8,445 Sq. Ft. (Please reference Attachment A for photos of area) $ $ 5. 1 Each Collette Men’s and Women’s Locker rooms – this includes prepping, priming, and painting the block walls, lockers, bathroom stalls, and shower stalls with water-based epoxy paint or similar, two colors to be determined, approximately 2,882 Sq. Ft. (Please reference Attachment A for photos of area)