Specifications include, but are not limited to: •Design of sanitary sewer pipe and manhole rehabilitation utilizing CIPP lining, inline point repairs,pipe bursting and manhole lining/ insert technologies. In the event that atotal pipe or manholereplacement fails the engineering firm will be required to perform emergency engineering servicesasrequired.•Construction administration and construction observation (CA/CO) will be utilized for CFPUA designed projects as well as designs by engineering firm for sanitary sewer pipe and manhole rehabilitation projects. CA/CO services shall consist of field observation, coordination, preliminary submittal review, and preliminary pay request review. The construction observer will report directly to the engineer of record. Experience with gravity sewer rehabilitation projects in an active urban environment is required. Surveying will typically be manholerim and inverts of all pipes entering and exiting the structureor equivalent shots on other linear infrastructure.Survey shall be conducted to the nearest tenth of a foot unless otherwise stated.•Request for quotes of design work, CA/COand surveying shall be submitted to CFPUA within 5 business days of request. Quotes will include a timeline for completion of design work and surveying. CA/CO services will begin as soon as notice is given.