1 Mobilization, Bonds, Insurance (no more than 3% of Total Price) 1 LS 2 Clearing and grubbing 1 LS 3 Erosion Control 1 LS 4 Traffic Control 1 LS B WELL SITE DEVELOPMENTS 5 Supply and install Well Pump, 1000 GPM at 100 to 330 ft TDH , together with motor, VFD and associated electrical and mechanical work 2 EA 6 Supply and install Standby Generators for Wells 3 and 6, 200 HP each 2 EA 7 Well Head Manifold 2 EA 8 Supply and install 8-inch Electromagnetic Flow Meter 2 EA 9 Supply and install 2-inch Combination Air Valve with surge control 2 EA 10 Supply and install 2-inch Air Release Valve 2 EA 11 Supply and install 8-inch Pump Control Valves 2 EA 12 Supply and install 8-inch Nonrising-Stem Flanged Gate Valve 4 EA 13 Supply and install 4-inch Nonrising-Stem Flanged Gate Valve 4 EA 14 Construct Well House for Wells 3 and 6, including floor slab, superstructure, drainage and blowoff pit complete as per drawings 2 EA 15 Heating and air conditioning for Wells 3 and 6 Well Houses, complete as per drawings 2 EA