Specifications include, but are not limited to: NCORR is seeking to qualify skilled prime construction contractors to perform, or cause to be performed, rehabilitation, reconstruction, manufactured housing unit replacement, demolition and/or elevation of eligible structures in compliance with local, Federal, and State statutory requirements. Contractors are encouraged to list all construction experience relevant to the residential construction projects. (See Section 4.4). The scope of work for each structure will vary, but may include, although not be limited to, the following: a) Obtaining all necessary state and local permits and approvals prior to commencement of the work for each structure; b) Removal of any above and/or in-ground oil tanks identified at the project site. The scope of work for this activity includes but is not limited to any permitting requirements, removal, cleaning, and disposal of tank, including all the tank contents, and remediation of any stained soils or surfaces; c) Marking and identification of all utilities passing through the area; prepare the property prior to commencement of structure demolition; d) Identify, remove and properly dispose of all universal and household hazardous wastes remaining in the structures; e) Perform baiting; f) Provide protection of adjacent properties and pedestrians, where applicable; g) Prepare the property prior to commencement of structure demolition to include but are not limited to: o erecting orange hi-viz safety fence around structures to be demolished; o establishing silt fence and erosion control barriers as well as covering and protecting storm drains to prevent debris and soil run-off; o placing 6 to 8 ft. chain-link fence panels across the front of the property to aid in site control; o erecting any signage required by local, State, and Federal regulations.