Specifications include, but are not limited to: • All surfaces to be painted shall be cleaned of any foreign materials which will adversely affect adhesion or appearance of applied coating. • Wood surfaces shall be sanded smooth and cleaned thoroughly before proceeding with application of first coat. • Metal surfaces shall be washed with mineral spirits to remove dirt or grease and shall be wire-brushed, scraped or sanded clean to remove rust or scale. • Surfaces damaged by scratches or other abrasions shall be carefully sanded smooth and cleaned in preparation for painting. • Where the prime coat has been damaged, or is removed in the cleaning operation, it shall be reprimed with the material specified for prime coat and follow 5.0 SCOPE OF WORK. • Additionally, inspect the structure for any hidden damages or required repairs that are in addition to the approved work on the PO that is issued. General Specifications: • Contractor will provide all equipment and devices needed for work. • Contractor will provide one year warranty on all workmanship and standard warranty on material as per manufacture specification. • Job site to be kept clean and safe during process and inspected by unit personnel upon completion of work. Contractor is responsible for any and all fees, permits and inspection costs for this repair.