Specifications include, but are not limited to: The work will generally consist of clearing, grading, stormwater pipe and structure removal and installation, utility relocations and adjustments, curb and gutter removal and installation, stream bank stabilization installation, asphalt pavement removal and installation, traffic control, flow diversion and dewatering, erosion and sediment control, and other related items as shown on the plans, in the contract specifications and/or as directed by the Project Engineer. The Contractor shall be responsible for the installation of soil erosion and sediment control devices; earth excavation; fill borrow, topsoil and seedbed material; and storing and stockpiling material and stabilization measures.