Specifications include, but are not limited to: A brief description of work in the project follows: Demolish the existing chillers and dedicated chilled water piping. Provide a new chiller plant consisting of (3) 100T packaged air cooled chillers with pump modules and associated chilled water piping to connect to the existing dual temperature loops serving the Main Building and Annex Building. Provide new dedicated outside air units on the roof and all associated ductwork and air distribution devices. Ceilings and lights will be demolished and replaced to accommodate installation of new ductwork. New lights and exhaust fans will be wired to existing circuits and controls. The existing electrical system will be modified as required to feed new equipment from the existing 2500 amp service serving the campus. New fire rated ceilings will be installed to replace demolished ceilings and in select areas to conceal duct below existing ceilings. Bid Alternate pricing will be included for replacement of select areas of ceilings, for new work in the Annex Building, and new work in the Gym Building. Existing unit ventilators and fan coil units and associated piping will remain until a future phase of work. New equipment will be controlled with an open protocol BacNet DDC controls system that will interface with existing equipment on the campus. All work under this contract is to be included in a Single Prime contract to the successful bidder