Specifications include, but are not limited to: design and install a complete and fully-functional photovoltaic system including, but not limited to: roof mounted solar panels, grid-tied inverters, disconnects, conduit, conductors, fuses, meter lugs, buss bar service lugs, support systems, anchoring/attachment devices, and control wiring; Work with the City and roof manufacturer to maintain roofing warranties; Provide all labor, materials and equipment to install the system per the approved design; Provide any and all roof and/or wall penetrations; which will be designed and executed in accordance with the City of Durham General Services Department, and sealed to prevent water infiltration; Submit all required documents to the Durham City/County Development Services Center for Permit Review and Inspections. The Project will require, at minimum, a Building and Electrical Permit; Payment of all submittal, permit application, document review, permit, inspection and reinspection fees.