Specifications include, but are not limited to: BCF-700, Benchtop Core Flooding System for EOR Studies, Vindum Engineering and/or Equivalent Product. BTSP-250-10K-SPARES, Syringe Spare Parts for Two Years Operation, Vindum Engineering and/or Equivalent Product. BCF-700-SPARES, Spare Parts for Two-Years Operation, Vindum. The equipment must meet the following basic capabilities: • Achieve stable temperatures of up to at least 150 oC • Achieve stable overburden and back pressures up to 64 Mpa • Able to perform single-phase permeability as well as two-phase relative permeability measurements for a variety of fluid phases (e.g. gas, aqueous, oil) • Allow collection of discrete effluent volume samples • Allow accurate measurement of confining pressures as well as pressures at the core or column inlet and outlet • Allow flexibility in ranges of fluids, flow rates, physical conditions, and experimental procedures • Must include a software control system to implement a wide range of experimental conditions