Specifications include, but are not limited to: Contractor is to remove the existing unit, remove the unit from the premises, and disconnect piping and electrical in a way that it can be reconnected. o Any modifications to doors or door frames for the removal of equipment or delivery of equipment will be at the Contractor’s expense. If modifications are needed, the Contractor is to restore doors & and door frames to existing conditions. o Contractor is to reconnect to existing piping and/or replace piping in the vicinity of the unit to make the systems fully functional. Any piping or electrical which must be rerouted or replaced is the responsibility of the Contractor. o Contractor will be responsible for all utility disconnections, reconnections including gas, electrical, plumbing, flue, fire alarm systems and Metasys. o Contractor is to reintegrate the existing Metasys building automated system controls to the new chiller with existing functionality.