Specifications include, but are not limited to: The project generally consists of a new detention center, Sheriff’s Office with a 911 suite and detached prefabricated metal building totaling approximately 102,930 SF. The project is mixed-construction consisting of both Type II-B and Type I-B construction, Group I-3 and Group B occupancy. Construction includes concrete and brick veneer masonry construction with steel framing, interior CMU partitions, TPO roofing, architectural casework, food service equipment, detention equipment, security electronics, and finishes typically associated with a new detention center. The Project includes a kitchen, laundry, vehicle sally port, intake/ booking and steel detention cells. Sitework includes stormwater management, sidewalks, parking lots, grading, and fencing/ gates, sewer lift station. A radio tower for the 911 center will be located on site. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, controls, and roof top units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator, power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens).