Specifications include, but are not limited to: The work under Contract TI-5 includes all work shown on the Contract Drawings, specified herein, as required for a complete project. The following is a general description of the principal work items only and shall not be construed as a complete description of the work to be performed. a. Demolish select asphalt driving and parking areas, concrete curbs and sidewalks, site parking area lighting, electrical panels, circuit breakers, conductors, and conduits, site fence and entrance gates (motor operated and manual), fence concrete footing and related appurtenances. b. Demolish buried concrete pipe supports from TI-3 temporary piping from the Pump Building to the primary tanks. c. Demolish select catch basins and related piping. d. Modify several catch basins and manholes rim elevations. e. Remove one electric vehicle charging station and turn equipment over to DEP.