Specifications include, but are not limited to: 1. Comprehensive Facilities Conditions Assessment a- Provide an assessment of the percentage used of the service lifespan of Combined Javits building components, systems, and equipment for renewal forecasting. Bidder shall provide baseline standards for reference to support the projected service life for each element. Bidder shall use statistical guidelines and nationally recognized references for cost data to model building system costs. The Facilities Conditions Assessment shall address all Combined Javits capital building components, systems, and equipment, including but not limited to: • Roofing systems; • Building envelope and waterproofing; • Exterior aluminum and glass curtain walls and gaskets; • Exterior precast concrete panels; • Exterior curbs and sidewalks; • Exterior inner roadway and waterproofing (11th Avenue to 34th Street to 12th Avenue); • Exterior existing L1 and L3 loading dock ramps; • Primary structural steel framing (including space frames throughout Crystal Palace, L3, and L4); • Interior structural steel framing, (including columns and pile foundations 2. Long Term Capital Asset Plan a- Evaluate current and future levels of service in Combined Javits necessary to support on-going first-class convention center operations i. In consultation with CCDC and CCOC, define realistic targets and timeframes to achieve and maintain performance standards. ii. Assess the current performance of the Existing Facility and show this performance relative to proposed performance standards. iii. Discuss external trends that may affect expected levels of service or the ability of Combined Javits to meet them. iv. Provide best-practices for how and when information regarding performance and targets will be updated.