Specifications include, but are not limited to: Description of Project: A general description of the project work includes the following: 1) The construction of Shafts 17B-1 & 18B-1. 2) Tunnel unwatering, access, initial inspection, photography, video, cleaning, repair and final inspection work in CT3, Stage 2 in Queens and Brooklyn. 3) Engineer-Ordered Bailout. Shaft 17B & 18B work includes, but is not limited to, the following: 1) Maintenance and Protection of Traffic. 2) New Con Ed Electrical Service, Temp Blockhouse & Electrical Distribution System. 3) Perimeter Noise Barriers & Retaining Walls 5) Misc site demolition. 6) Site clearing and grubbing. 7) Temporary facilities including Guard Booths, Contractor’s Trailer, Engineer’s Trailer, and Worker (Sandhogs) Facilities. 8) Sewer Work 9) Site Excavation