Specifications include, but are not limited to: The construction of a centralized community wastewater collection and treatment facility to expand and provide wastewater service to the Rio Arriba County Detention Center, Rio Arriba County Administrative Building, and Rio Arriba County Low Income Housing (LIH) within Tierra Amarilla. The expansion of service will require installation of a 15,000-gallon per day wastewater STM Aerotor treatment plant, an STM Aerotor control panel, an STM Aerotor remote access package, an anoxic/equalization basin including submersible pumps, a 5,000 gallon emergency holding tank, concrete pad around treatment system, all internal piping and electrical, and site grading; Effluent Disposal to include: site grading and clearing for 1.5 acres, flow splitting basin, 50 linear feet of 6" gravity effluent sewer line to dosing tank, CCTV inspection of all gravity sewer lines, LPD field flush valve assembly, irrigation headworks and vault, LPD field unit including excavation, geotextile fabric, granular fill, piping, fittings, valves and backfill, LPD dosing tank and pumps; Administration/Archive Bldgs Gravity Sewer to include: 550 linear feet of 8-inch PVC gravity sewer, 4' diameter manholes, and asphalt removal, disposal and replacement, CCTV inspection of all gravity sewer lines; LIH to WWTP Forced Main to include: 3,250 linear feet of 4" PVC sewer force main, removal, disposal, and replacement of asphalt, 80 linear feet of casing, 1" combination air relief valve, pressure clean outs, and all appurtenances; Low Income Housing (LIH) Gravity Sewer to include: one packaged lift Station including electrical and controls, approximately 1,650 linear feet of 4-inch PVC sewer service lines from clean out to gravity sewer main line, 2,500 linear feet of 8-inch gravity sewer, 4' diameter manholes, abandonment of all LIH septic tanks, sewer connections, and CCTV inspection of all gravity sewer lines.