Specifications include, but are not limited to: 1. PHASED CONSTRUCTION: a. The DA’s office will remain occupied throughout phased construction, (as indicated in the construction documents on sheet C1). Offerors are required to submit evidence of prior experience in conducting a phased construction projects. b. Staff will be temporarily relocated to vacant areas as the work progresses. The contractor will aid in moving office furniture to temporary and then final office locations. Working with staff to protect confidentiality of legal documents is of utmost importance during construction. Offerors are to factor in the cost of phased staging. c. Offerors shall submit a safety plan that includes OSHA and appropriate safety standards to be implemented during all phases of construction, which will accommodate both construction and office requirements, and to maintain a clean and safe environment as much as is practicable. All Offerors shall submit their phased construction plan for review, which coordinates all construction activities and schedules with the DA’s staff requirements, the architect and the County representatives. 2. SITE WORK & DEMOLITION: a. Fencing, gates and signage at designated staging area. b. New Security fencing with gates including access control. c. Removal of paving at the main entrance. d. New hardscape as noted. e. Relocate planting as noted. 3. EXTERIOR RENOVATION: a. Replace 75 windows b. Exterior painting & repair of wood trim, doors and balconies. c. Stucco repair and apply new finish coat. d. New roofing. e. New double entry door with sidelights and access control hardware. 4. INTERIOR RENOVATION: a. Demolition of designated partitions. b. New partitions as noted. c. New counter and cabinet work.