Specifications include, but are not limited to: Provide all materials and labor needed to make complete connection to existing vaporizer. This includes all code requirements for the piping from the new bulk tank to existing vaporizer A crane will be needed to lift the tank from the delivery truck to the tank pad. Company supplying the crane must include a rigging team with the crane. The lifting plan will also be part of the safety plan. Shipping for the tank from manufacture location. These tanks are made when ordered and will be shipped to New Mexico. Awarded vendor will review and ensure the tank is installed properly and is free of leaks. Startup will require the contractor to explain all operating functions to staff at the hatchery. New Tank Specifications: Gross gallons – 6,000 Maximum allowable working pressure – 250 PSI