Specifications include, but are not limited to: The Contractor shall furnish all labor, supervision, equipment, materials, registrations, licenses and supplies necessary to transport glass from the BuRRT to the designated recycling facility. The Agency has designated MillerCoors Rocky Mountain Bottle Company as the primary glass recycling facility and Strategic Materials as the secondary facility. The Contractor shall haul the glass to the designated facility, as determined by the Agency, Monday through Friday in a manner that ensures the timely removal of glass. The Contractor shall provide a semi-truck and a leak-proof end-dump trailer capable of transporting up to twenty-three (23) tons of glass that are maintained in accordance with DOT rules and regulations.