Specifications include, but are not limited to: •High efficiency refrigerant cooling throughout the building and updating the internal circulation within the building by connecting the building to the campus chilled water loop; •Removal of the ad hoc mixture of cooling systems; •Addition of a fire sprinkler system throughout the building; •Upgrade of the Electrical, Mechanical, and IT systems that will utilize direct digital controls for the HVAC system and LED lights providing energy efficiencies; •Selective interior remodeling of all three floors to provide much needed office space and storage along with new paint, flooring, and windows; •Landscaping upgrades that will better integrate the rear entrances of the building into the campus common.